The Use of Concurrent Engineering to Reduce Lead Times on Gas Turbine Castings

$25.00
(0) Write a Review

Product Description

PaperID: 859
 
EventID: 4
 
Author: S. J. Carson, European Gas Turbines Ltd., UK
 
Keywords: Quality Control & Defects
 
Paper Pages: 15
 
Paper Year: 1993
 
Paper Index: 12.26
 
Paper Source: 53